What's new
FORUMS - COASTERFORCE

This is a sample guest message. Register a free account today to become a member! Once signed in, you'll be able to participate on this site by adding your own topics and posts, as well as connect with other members through your own private inbox!

Disney's Hollywood Studios | Monsters Inc | Vekoma SFC | 202?

They've also put out a model on the D23 show floor today of what we can expect of this coaster. It seems to contain three adjacent show buildings;
View attachment 33151

From left to right, we see the queue. The second looks to my knowledge like four side-by-side elevator lifts. Definitely expecting lengthy show sequences here. The third contains the rest of the layout, which is definitely a bit of a mess.

The M shaped structures have begun going up for the Loading Room, where elevator lifts will fly out lift riders right out of the station;
wdw-dhs-monstropolis-construction-door-coaster-2.jpg
1786636900165.png
Source

Funnily enough these aren't going to take riders up to peak height, it'll go uphill a tad before riders reach the main layout.

We will presumably hear more details at D23 tomorrow night. The land is a lot farther ahead so I'd expect that to open before the coaster.
 
Details were slim on the coaster, asides from the elevator lifts taking riders up 45 feet in four seconds. Again I think the actual coaster will still go slightly taller. There was a bit of animated footage published of the station as well;


As expected, the land will officially open next year. Coaster timeline is still TBD.
 
Back
Top